 |
| Assignment name :
|
Yazd BOO combined cycle power plant |
|
| Specifications :
|
Yazd Combined Cycle Power Plant comprises two gas turbines, each with a capacity of 162 MW and a steam turbine unit with a capacity of 160 MW. The total capacity of the power plant is 484 MW |
|
| Role on the assignment:
|
Design Review and Supervision |
|
| Client:
|
Energy Gostar Jam Co.Iran |
|
|
|
|
|
|
|
|
|
|